Projects // SPORTS // Chelsea Football Stadium

New media box, with access stair onto existing structure.  Steel frame fully erected, cladded and 4m glass screens installed at ground level.  The 28 Tonne unit then transported 300m and lifted into place with a 250 Tonne mobile crane.

Project by WIG - the Steel Fabrication Experts