Projects // Experimental // Blast Containment Structure

This 40 tonne steel frame erected inside an existing building and cladded with 35 tonnes of 10mm thick steel plates used over 7000 grade 10.9 fixing bolts for steel and 500 plus, resin anchor fixings to existing slat.

Click here for a short time lapse of the construction